BIM & Estimating

BIM.jpgBuilding Information Modeling (BIM) was originally designed to create architectural 3D renderings of a project before construction began. BIM quickly became an excellent tool for contractors to coordinate equipment interferences or clash detection for better collaboration between trades. In either case, BIM's objective is to create a 3D computerized model of a project to work out construction designs and conflicts prior to incurring construction costs to ensure that budgets, schedules, and quality are maintained once construction is underway.

BIM has evolved into a detailed pre-planning and collaboration tool for both internal and general project team members. 

Sophisticated software has been developed over the years to create 3D construction models for efficient workflow and collaboration from concept through construction. 3D modeling software is also providing more efficient workflows that include pre-fabrication, tracking, and layout for MEPT (mechanical, electrical, plumbing, and technology) contractors. Traditional tools on the job site, such as a simple measuring tape or conduit bender, are being replaced with robotic lasers, scanners, and software-driven tools with information being sent to them from the 3D models that increase productivity and accuracy on the job site.

An important aspect of BIM is the detailed real life model that creates a deliverable plan for each project. Workflows become more efficient when adhering to a plan and where deliverables are measurable. A Work Breakdown Structure (WBS) has traditionally provided a process of itemizing a hierarchy of project tasks that become the construction model for each project. Therefore, it is prudent to create the WBS at the pre-construction stage to help ensure thoroughness of the design and budgets and to serve as an early foundation for effective scheduling and cost estimating.

Estimating software has become the catalyst for contractors in creating a WBS as the basis of each estimate. Project tasks can be systems such as horizontal cabling, intra- and inter-building backbones, MDFs, IDFs, fixtures, feeders, fire alarms, etc., with a hierarchy of sub-tasks to account for the physical layer of construction, including buildings, floors, floor heights, itemized construction phases, and areas. Detailed bills of material, labor hours, and costs from the estimate can be accounted for to ensure completeness of each task of the WBS.

Integration with estimating software means that 3D construction modeling designs can now generate real bills of material and labor hours for more effective cost comparisons to the budgets and designs. The final labor hours and cost on a project are dependent on many variables during construction, and mitigating the risk on labor has proven to be one of the biggest factors in maintaining budgets and profits. The inherent term 3D is an ideal marriage between 3D modeling and the development of a WBS. 3D models provide many of the key elements that can affect the labor on any project. For instance, the ease or difficulty of an installation will be affected by floor heights. The installation costs can also be affected by the requirement of premium time for any of the areas of the project. Therefore, it is critical that budgets take into account these physical and logistical variables to ensure that budgeted versus actual labor costs are as close as possible to maintain profitability.

As BIM continues to evolve, 3D construction modeling designs can now generate real bills of material and labor hours for more effective cost comparisons to the budgets and designs.

Estimators are still using traditional 2D drawings to develop the budgets during the pre-construction stage, but BIM and 3D Modeling is becoming more common for project management during the construction stage. However, estimating and BIM provide a very useful role for a contractor because of the WBS. If budgets